Industrial Manufacturer in Pune, Maharashtra · Serving All India

5/7/9-Tank Configurations · Superior Adhesion

Pre-Treatment Plant
Manufacturer in Pune

Multi-stage phosphating and degreasing plants in 5-tank, 7-tank, and 9-tank configurations with hot-rinse, DM water passivation, and automated spray nozzle systems for superior coating adhesion and long-term corrosion resistance.

Free adhesion test review Proposal within 24 hours Salt-spray tested

What We Build

Where 60% of
Coating Failure
Gets Prevented

Independent studies show that more than 60% of coating failures peeling, blistering, poor salt spray performance trace back to inadequate pre-treatment. Not the powder. Not the paint. The preparation.

paint spray booth manufacturer in pune

A well-engineered pre-treatment plant transforms a metal surface from paint-hostile to paint-receptive. It strips oils and dirt, converts the oxide layer into a crystalline phosphate conversion coating, and passivates the surface so the topcoat can chemically bond and mechanically anchor.

Our pre-treatment plants are engineered with the exact number of stages your process needs 5-tank for simple degrease-and-coat, 7-tank for integrated derust, and 9-tank for maximum salt-spray performance. Every plant ships with documented parameters: stage temperatures, cycle times, chemical concentrations, and phosphate coating weights.

Grade-1 Adhesion

Cross-hatch tested to ASTM D3359. No peel, no flake, no lift.

500-Hr Salt Spray

With our 9-tank configuration, coatings exceed 500 hours of salt spray resistance.

Consistent Batch-to-Batch

Automated control of temperature, chemistry, and cycle time no operator guesswork.

Our Product Range

Pre-Treatment Plants
We Manufacture

From compact 5-tank dip plants for MSME job shops to 9-tank automated spray tunnels for Tier-1 automotive OEMs.

01

5-Tank Dip Pre-Treatment Plant

Compact dip process: Degrease → Rinse → Phosphate → Rinse → Passivate. Ideal for clean, oil-free MS parts entering powder coating or painting.

  • 5 Stages
  • MSME Ideal
  • Compact Footprint
02

7-Tank Dip Pre-Treatment Plant

Adds integrated derust (acid pickling) stage: Degrease → Rinse → Derust → Rinse → Phosphate → Rinse → Passivate. Handles both oily and rusty MS parts in one line.

  • 7 Stages
  • Integrated Derust
  • Mixed Substrate
03

9-Tank Dip Pre-Treatment Plant

Full cycle with activation and DM water rinse: Degrease → Rinse → Derust → Rinse → Activate → Phosphate → Rinse → Passivate → DM Rinse. Best for 500+ hour salt spray.

  • 9 Stages
  • DM Water Rinse
  • 500+ Hr Salt Spray
04

Spray Tunnel Pre-Treatment Plant

Conveyorized spray tunnel with automated nozzles at each stage high volume, flat-part processing. Ideal for high-throughput conveyorized powder or paint lines.

  • High Volume
  • Auto Nozzles
  • Conveyorized
05

Combination Spray + Dip Plant

Hybrid design that combines spray and dip stages ideal for parts with complex geometry where spray alone misses cavities and dip alone is too slow.

  • Complex Parts
  • Full Coverage
  • Best of Both
Most Popular
06

Turnkey Pre-Treatment + Coating Line

Complete integrated line pre-treatment, dry-off oven, powder booth or paint booth, curing oven, and conveyor fully PLC-controlled and validated end-to-end.

  • Turnkey
  • PLC Integrated
  • End-to-End

Key Specifications

Technical
Data

Standard configuration parameters all customizable to your substrate and coating system.

Email for Datasheet
Tank Configurations 5 / 7 / 9 stages (custom up to 12)
Plant Types Dip / Spray Tunnel / Combination
Degreasing Stage Alkaline · 40–65°C · 3–8 min
Phosphating Type Zinc / Iron Phosphate
Phosphate Coating Weight 1.5 – 4.5 g/m² (Iron) · 2 – 6 g/m² (Zinc)
Phosphate Bath Temp 35 – 55°C (custom up to 70°C)
Final Rinse DM Water / Passivation
Tank Capacity 500 L – 20,000 L per tank
Heating Method Electric / Steam / Gas / Thermic Fluid
Spray Pressure 1.5 – 3.0 bar (spray stages)
Cycle Time per Stage 3 – 15 min (process dependent)
Salt Spray Performance Up to 500+ hours (9-tank)
Tank Construction MS with FRP lining / SS304 / SS316 (custom)
Automation Options Manual / Semi-Auto / PLC-Controlled Hoist
Process parameters documented at handover Cross-hatch adhesion test included

The Sairaj Advantage

Why Choose Our
Pre-Treatment Plants

Grade-1 Adhesion

Cross-hatch tested to ASTM D3359 no peel, no flake, no lift after our process.

500-Hr Salt Spray

With the 9-tank configuration, coatings exceed 500 hours of salt spray without failure.

100% In-House

Tank fabrication, FRP lining, spray nozzle manifolds, and hoist automation all under our roof.

Pan-India Support

Chemistry consulting, periodic bath analysis, and emergency breakdown support across India.

How We Deliver

Our 5-Stage
Delivery Process

01

Consult & Survey

Substrate review, part geometry analysis, existing chemistry audit, and space planning.

02

Design & Approve

Stage sequence design, tank sizing, nozzle layout, and process parameter calculations.

03

In-House Build

Tank fabrication, FRP lining, nozzle manifold, heater installation, and hoist assembly.

04

Site Installation

Precision erection, chemical charging, utility integration, and hoist programming.

05

Test & Handover

Coating weight test, cross-hatch adhesion test, operator training, and signed report.

Common Questions

Pre-Treatment
FAQ

Still have a question? Our process engineers reply within 24 hours.

5-tank vs 7-tank vs 9-tank which do I need?
5-tank is ideal when your incoming MS parts are already rust-free and only need degreasing + phosphating + passivation for MSME job shops and clean-sheet fabrication. 7-tank adds a derust (pickling) stage so you can handle both rusty and oily parts in one line recommended for real-world mixed production. 9-tank adds titanium activation and DM water rinse required for automotive-grade, 500+ hour salt spray performance and superior powder adhesion on zinc phosphating.
What salt spray performance can I expect?
With a properly run 5-tank iron phosphate system followed by powder coating, you can expect 250–350 hours of salt spray. A 7-tank zinc phosphate system delivers 350–450 hours. A 9-tank zinc phosphate with DM water passivation typically delivers 500+ hours. Actual results depend on the powder coating thickness and topcoat quality too.
Do I need a dip plant or a spray tunnel?
Dip is best for parts with complex geometry, hollow sections, or where parts are hung on jigs the chemistry reaches everywhere. Spray is best for flat or simple-shaped parts at high conveyor volume, and it uses less chemical per part. Combination gives you the best of both spray for the flat faces and dip for cavities. We help you choose based on part mix, throughput, and quality targets.
What about chemical supply and bath maintenance?
We provide the initial chemical charging with your order, along with documented bath parameters (concentration, temperature, pH, coating weight targets). We can also supply ongoing chemicals under a service contract with monthly bath analysis reports and recommended top-up quantities. Our team is available for troubleshooting if any stage drifts.
Can the plant be automated with a hoist system?
Yes. We offer three levels: manual (operator-driven hoist), semi-automatic (motorized hoist with push-button sequencing), and fully PLC-automatic (programmable hoist system that moves parts through each stage with exact timing). The PLC system is recommended for throughput above 20 jigs per hour and for plants where consistency is critical.
What does installation and commissioning involve?
We do precision erection, tank placement, piping and pump installation, heater connection, chemical charging, and hoist programming. Commissioning includes running sample parts through the entire line, measuring phosphate coating weight, performing cross-hatch adhesion tests, and training your operators on bath maintenance and stage discipline.
Do you offer AMC and breakdown support?
Yes. Comprehensive and non-comprehensive AMC plans covering periodic bath analysis, heater servicing, pump maintenance, hoist inspection, and emergency breakdown support across India. We also supply consumables (chemicals, filters, nozzles) on annual contracts with scheduled delivery.

Have a specific pre-treatment requirement?

Send us your part drawings and substrate details our process engineers will recommend the right stage sequence.

Ready to Order

Get Your Pre-Treatment
Plant Engineered & Delivered.

Free adhesion review · Detailed proposal in 24 hours · 500+ hour salt spray achievable.

Call WhatsApp Get Quote